The Development has two water wells for extraction, storage (300 m3), distribution and supply of potable water and a water pipe for fire protection system. Additionally, the developer has the necessary authorizations to handle and treat water sewage generated within the property. The development has underground pipes for gas supply as well.
Moreover, the park tenants will have access to the supply of electricity at high, medium and low voltage, fiber optic access to TELMEX or ALESTRA’s telecommunication network system and led lighting.
The Property is divided in 57 lots and the average area of each property is 2 to 3 acres that are capable of being merged depending on each tenant´s requirements.